Off-the-charts marine heat severely damages Ningaloo and other pristine coral reefs
Luck has run out for WA's coral reefs, with most under twice the level of heat stress that can kill coral. Climate change is the cause.
Offshore oil and gas operators that continually delay costly decommissioning will now be watched more closely by offshore safety and environment regulator NOPSEMA.
With $194 million at stake the owner and users of WA's biggest gas pipeline are promoting vastly different views of the future of gas.
Pilbara resource projects can access more competitive power and the South-West grid more easily add batteries and standalone power systems after law changes last week.
Shell's Prelude floating LNG will keep burning excess gas during a production shutdown of many months, adding to its already high initial carbon footprint.
NOPSEMA has given the environmental credentials of Woodside's Scarborough LNG project a regulatory tick and gushing praise.
Shell has shuttered production from its giant Prelude floating LNG facility and delayed the Crux backfill gas project.
Wood Mackenzie and Bloomberg agree that too much US gas, high stockpiles in Europe and demand hit by COVID-19 make 2020 a tough time for LNG sellers.
Woodside has dropped plans for a 12-week work roster blasted by unions as "catastrophically unsafe" and will move to a temporary roster of two weeks of isolation, four weeks work and two weeks at home to manage COVID-19 risk.
Woodside's offshore workers may get a $50,000 bonus for working 12 weeks straight but unions claim the long stint is unsafe.
Offshore unions have welcomed a deal with Inpex that adds two-weeks of isolation to the roster and gives half-pay to stood-down workers but slammed what they say is a Woodside proposal to work offshore for 12 weeks straight.
Woodside has told investors it can afford to bury CO2 from its Browse LNG project just months after telling regulators it was a "high-risk, high-cost" option.
Woodside had planned for 2020 and 2021 to be years of growth but now the Scarborough and Browse LNG projects are deferred and $US20.4 billion slashed from this years' budget as it joins its peers in survival mode.
All the info and a bit of comment on WA energy and climate every Friday